May 2006 Flood
Pictures from the May 2006 Flood
Click on any thumbnail for a larger version!
2  Next Page

Dock area on Goose Pond. Normally it is a 4.5 ft. climb down the ladder to the water


Goose Pond

Culvert to Mousam Lake

Mousam River at the old trolley tracks below Estes Dam.

The Mousam below the north side of Estes Dam




North side of Estes Dam




South side of Estes Dam

Mousam River under the south side of Estes Dam

It never overflows this far over...



Top of Estes Dam

The spillway under Emery Mills Dam. Normally it is down in a stone trench



The dam at Emery Mills. Normally is never overflows

2  Next Page

Back to Gallery Index